
Episode n.59 of 29/04/2025 – The Energy Call
In Episode 59 of The Energy Call, we discussed ARERA's DCO 173 on the guidelines for exempting the application of the unit fee to cover operating costs for the integrated information system also to trading counterparties and balancing users.
We spoke about the new technical specifications published by the GME for 15-minute block bids and the consultations published by ARERA on an update in the calculation of guarantees to electricity distributors on the calculation of producible capacity from renewable plants for Fenix and on the Maximum Reference Premium for Maxe auctions, respectively.
Finally, we commented on the revival of the markets after last week's bearish trend with European storages that, thanks to the reduced generalised demand, kept a high injection rate with the news at the political level of the positive vote by the European Parliament on the revision of the end-of-campaign filling targets with the consensus reached for a new target at 83% against the previous 90%, although further negotiations will still be necessary for the final adoption of the text.
Translated with DeepL.com (free version)
Ascolta "Pillola - Episodio n°59 del 29/04/2025 - The Energy Call" su Spreaker.
Ti potrebbe interessare anche


