
Episode n.55 of 25/03/2025 – The Energy Call
In Episode 55 of The Energy Call, we talked about the AGCM's operating subsidy for 2025, published in order no. 31478 of the extension granted by the cisea for the deadline for sending the rooms for the mechanism for offsetting amounts relating to the dispatching of electricity and gas supply transport, in accordance with resolution no. 604 of 2021. We then talked about the changes envisaged by Snam in the proposed update to network code number 76 and the features produced on Jarvis for the purposes of checking the storage credit limit.
We then commented on the changes in Terna's consultation document regarding the proposed amendment to the regulation of the guarantee system in force from February 2026, and finally we analysed the situation in the gas markets, especially with regard to the subject of storage, with the representatives of some states: France Cologne, Germany who continue to work to obtain a revision of the filling plan with the aim of moving the ultimate target from November to December with a possible lowering of the minimum level to 85% instead of 90
This is a brief summary of the full content of the Energy Call Italia, available in Italian.
Ascolta "Pillola - Episodio n°55 del 25/03/2025 - The Energy Call" su Spreaker.
Ti potrebbe interessare anche


