17/08/2026 – Memorandum signed by the United States and Iran expires, gas prices reach new highs – Read more news
French nuclear capacity today remains below its lowest levels in four years, bent by the latest heat wave. Over the past week, EDF has also had to deal with a partial shutdown of its Gravelines plant, with a capacity of 5.4 GW, due to an unexpected presence of jellyfish near water cooling facilities. Temperatures dropping in the second part of the week, however, pave the way for a rapid recovery, with availability expected to recover above the 40 GW threshold as early as Thursday, August 20.
